Frame tops

Sunday 16th December 07


I also managed to fit the backing strips to 4 roof tops for the forward cabins and fit them.
The frame dimensions here are critical as they make the final sizes of the sides of the boat up front. clamping and tecsioning the side frames to within 1mm of the correct dimension took some time but they are all perfect.



Front cabins roof.
Note the little slots all lining up perfect.


Im very happy with todays progress, and once the stringers are tacked in correct places the side walls are going on over christmas.

Tomorrow (Monday) aft frame stiffeners and more roof bits.

Related Posts by Categories

0 komentar:

Posting Komentar




Blog Archive

Diberdayakan oleh Blogger.