I tidied up some wiring today.  I enclosed in flexi trunking the remote start cable for the generator, the output cable and the power cable for the bilge pump, and connected the immersion heater wiring and a few other little jobs.

 The end of the run

Once done I fired up the generator with the shore power still plugged in and the auto switch over worked both in and out seamlessly.  I still have to install the bilge pump but the wire is there now.

I finally got the remainder of the plinth for the bathroom so installed that and while in there I siliconed the toilet in as well

I put the recessed fender mounts in on the port side and have been doing some work on the rudder.

 
I also filled and calibrated the water and waste tank gauges.  Well the waste water one was manufacture calibrated as it was matched to the depth of the tank, but I filled the tank to check it.  The water did need calibrating whic was simple following the manufacturers instructions.  

The waste tank is showing just over half now as I also got to test the self pump out system, which as you can see as the level is down works.



Another little job thats been hanging around is the fitting of the handles and locks for the gas and kit lockers on the stern of the boat.