Metalwork Today

Makes a change to do some metalwork again.

I got the lids for the stern lockers back form the press works so it was now a case of making up a rim to make the lids self draining but NOT into the lockers.  I only stitch welded the frame as I didnt want to distort things too much as the lids are a snug fit.

 


 Gas Locker

With Lid

 Port locker
With Lid

The white line is sealer and is in place of full welding.  

I have also started rubbing down the primer ready for another coat to bring in the areas I have damaged by welding then it will be on to undercoat and top coat for this area.

Related Posts by Categories

0 komentar:

Posting Komentar




Diberdayakan oleh Blogger.